Basement gets water and light (well nearly)

Work continues on the basement. It’s all pipes down there.

This is the hall area where the flat joins with the main part of the house. It’s so luxurious it even has a radiator.  Ooh.

This is the view into the bathroom.

The barrier at the top of these steps is to stop the dog going down, jumping the last step and then getting trapped down there. She doesn’t seem to be learning from this mistake. We are still missing a bottom step hence the problem.

This radiator is to go in the bedroom under the french doors / long window. It’s only from B&Q and seems to be the perfect size.

The front room / open plan kitchen still needs some work. Although we do have a boiler now.

Is it more depressing to have a wheelbarrow in your lounge…

…or a cement mixer in your bedroom?


What does look great is the office, set up as a music studio for Klaus. The half-door I think is a great idea of his.

The pigeon holes/ shelves in here are from Graham and Green.

The next steps are to tile the bathroom and put in the toilet etc which we have already bought. Hopefully this next stage should see some swift improvements.

Leave a comment